Same experts. A fraction of the manual effort.

Rapid Deploy is Trundl’s deployment engine. It reads the documentation and configuration your teams already have, and builds your Atlassian environment from them. We measured how much time that saves.

  • −70% solution-design effort

  • −60 to 95% manual buildout effort

  • −70 to 90% test-to-refinement time

Trusted by teams building on Atlassian.

An Atlassian deployment is three phases of hand work.

Design the solution. Build it out. Test it until teams accept it. Most of the industry does all three by hand, which is why the work gets quoted in months. Rapid Deploy automates the repeatable part of each phase.
  1. Phase 01

    Solution Design

    Owned today by Senior Solution Architect (business and technical)

    Turning business requirements and problems into a build plan and the sequential work items that follow.

    Translating a greenfield vision into the right projects, structure, and sequence of work.

  2. Phase 02

    Solution Buildout

    Owned today by Atlassian engineer or admin

    Manually configuring permissions, project settings, workflows, labels, and forms in the Jira and JSM back end.

    Standing up projects, workflows, forms, and permissions from scratch.

  3. Phase 03

    Testing and Refinement

    Owned today by Engineer, solution architect, or admin, plus the user group

    The loop from test hand-off to documented feedback to manual changes, traditionally measured in weeks.

    Getting new teams into a test instance and iterating to acceptance.

What Rapid Deploy takes off your hands

Rapid Deploy reads your existing setup, drafts the build plan, sets up the standard projects, workflows, forms, and permissions, and runs the test-and-fix loop. That is the work that repeats on every deployment.

What your experts keep

Integrations, edge cases, security and governance calls, business trade-offs, and the one-off needs that make your organization yours. Rapid Deploy gives your architects their time back. It does not replace them.

Toshiba Global Commerce Solutions case study

Toshiba’s build took 10 hours, not the 130 that were scoped.

Toshiba needed global hardware commercialization teams on Enterprise Jira for executive portfolio visibility, earned value management, and capacity planning, without forcing teams to abandon processes they already understood. Roughly 130 build hours compressed to 10, which sits at the top of the 60 to 95% buildout range.
Toshiba Logo

~92%

fewer build hours

8

teams moved to Jira

83

users participating

130 to 10

build hours, scoped versus actual

2 weeks

evaluation to executed displacement

2nd meeting

teams testing their own Jira

Context
handed over

Process documentation, work breakdown structures, commercialization phases, task models, terminology, and workflows all went in as input.

Environment built

An Enterprise Jira environment with project structures, phases, custom fields, workflows, dashboards, team boards, and portfolio rollups.

Teams
validated

Eight teams across electrical, mechanical, BIOS, compliance, manufacturing, and testing ran their own workflows in a sandbox.

Displacement
executed

Familiar structures and terminology carried over to reduce retraining, and the build added capabilities Smartsheet could not reach.

Trundl is leveraging AI in innovative ways. We anticipated months to build a custom Jira solution for a new development process, but Rapid Deploy analyzed our requirements meeting transcripts and delivered a sandbox-ready configuration within hours of our second meeting.

Jim Hawk

Toshiba Global Commerce Solutions

How long the work takes.

Typical durations by product and by migration path, measured against a traditional, manual approach. Ranges reflect size and complexity.
Solution or migration path Traditional Rapid Deploy

Mature enterprise solution deployments

Jira and Teamwork Collection solutions

2 to 5 months

1 to 6 weeks

Jira Service Management and Service Collection solutions

1 to 4 months

1 to 6 weeks

Platform migrations and displacements

Smartsheet to Jira

2 weeks to 3 months

2 to 5 days

monday.com to Jira

1 to 3 weeks

1 to 3 days

Asana to Jira

2 weeks to 3 months

2 to 5 days

ServiceNow to Jira Service Management

3 to 18 months

1 to 8 months

Freshservice to Jira Service Management

2 to 5 months

2 weeks to 2 months

Atlassian to Atlassian migrations, with transformation

Data Center to Cloud

3 to 18 months

1 to 9 months

Cloud to Cloud

1 to 6 months

2 weeks to 3 months

Want these numbers run on your own project?

Bring the project you are scoping. Trundl will show you where the hours go today, and what Rapid Deploy takes out of them.

How we counted.

Where do these numbers come from?
They are Trundl-observed benchmarks across engagements, not modeled estimates. Results vary with project size and complexity.
A traditional, manual approach. Solution Design and Solution Buildout measure human effort. Testing and Refinement measures elapsed time between test hand-off and a refined instance.
Ranges reflect complexity. The more standard the work, the higher the reduction. Heavy integrations and idiosyncratic needs sit at the lower end.
No. Each one is per phase. They are shown separately and are never summed into a single project-wide number.